Carmichael are seeking a Sub Agent to join the team working on the LPT2 Project.
Ensure through on-site supervision that the construction works are undertaken to required designs, specifications, standards and Health and Safety requirements
andbull; Monitor costs and provide the Package Manager with monthly identification of deviations from the budget
andbull; Ensure completed work packages can be handed over to the client
andbull; Minimisation of disallowed costs throughout the project
andbull; Support community and environment requirements
andbull; Produce and maintain a detailed and resourced 4 weeks (minimum) look-ahead programme for area of responsibility including detailed interface with other project areas, ensuring compliance with operational / contract programme. Manage works to achieve the agreed programme
andbull; Review, on at least a weekly basis, progress against programme and identify areas of variance. Provide reports to line management and commercial teams detailing reasons for variance and action plans to recover any slippage.
andbull; In conjunction with Foreman, actively review requirements for all plant and equipment within area of responsibility to support compliance with programme and commercial requirements.
andbull; Review weekly plant, labour and material returns to identify areas of variance from planned usage.
andbull; Provide reports to line management identifying the reasons for the variance, including action plans to reduce wastage and improve positive variance.
andbull; Immediately stop the works where unsafe operations are observed
andbull; Support the Package Manager on decision making and actions on all construction aspects of the project
andbull; Maintain a detailed knowledge of subcontractorsandrsquo; scopes of work.
andbull; Maintain a detailed knowledge and records of site progress, including details of any potential variations. In conjunction with commercial team, critically assess subcontractor records, applications for payment and variations.
andbull; Ensure that appropriate checks of competency are undertaken on all personnel working within area of responsibility prior to their starting works, including subcontractors and Third Parties and notify the HR Manager of training requirements
andbull; Ensure that all required temporary works documents, including briefs, designs and method statements / risk assessments, are produced and approved in accordance with the programme and prior to works commencing.
andbull; Review and approve relevant ITPs, NCRandrsquo;s and other quality documentation for area of responsibility, including those for subcontractorsandrsquo; works, in accordance with project procedures.
andbull; Liaise with client, designer and third party representatives as required, including maintaining appropriate written records.
andbull; Promote and share lessons learnt, innovation and best practices
andbull; Promote a strong culture for HMJVandrsquo;s One Team, One Spirit ethos as well as ensure National Gridandrsquo;s andldquo;Everyone Home Safe and Healthy Everyday Valueandrdquo; is present on the project; actively promote engagement with the CDP programme
andnbsp;
Knowledge, Skills andamp; Experience:
andbull; Degree in Engineering discipline
andbull; Proven experience in a similar large engineering project
andbull; Ability to produce, implement and manage safe systems of work for construction procedures
andbull; An understanding of the commercial issues in undertaking a large-scale construction project
andbull; In depth technical knowledge of area of responsibility and good knowledge of remainder of project
andbull; Responsibilities of the Contractor under CDM Regulations
andbull; Excellent knowledge of current civil engineering legislation as well as Health andamp; Safety and Environmental legislation
andnbsp;